This prop was featured as an important plot device in two ARROW episodes.
Design Process
To make it more practical for the on-set crew to work with, only the first 3" of each steel drum was provided. With some soil dressed around the perimeter, they would seem almost completely buried, without the actual effort to bury an entire 40 gallon drum.
Construction Process
Video Clip
|
RDX Barrel Bomb - ARROW from PROPOLOGY on Vimeo. |


