Design Process
dozens of other unseen drums.
To make it more practical for the on set crew to work with, only the first 3" of each steel drums was provided. With some soil dressed around the perimeter, they would seem almost completely buried, without the effort to bury an entire 40 gallon drum.
Construction Process
Video Clip
RDX Barrel Bomb - ARROW from PROPOLOGY on Vimeo.